毛坯房验收要关注五大方面 防水24小时闭水实验
[导读]虽说“新房质量不过硬,家装可以来帮忙”,但“多一个施工项目就多花一分钱”,如果能在装修前看清装修隐患,在收房过程中就解决问题,扫清装修障碍,后期会少很多麻烦。
虽说&新房质量不过硬,家装可以来帮忙&,但&多一个施工项目就多花一分钱&,如果能在装修前看清装修隐患,在收房过程中就解决问题,扫清装修障碍,后期会少很多麻烦。
墙面三角尺靠墙检验阴阳角是否垂直
墙面是收房验房的一大重点,业主入户后应全屋走一遍,先查看墙壁是否有渗水痕迹,是否有裂纹、刷纹,若裂缝与墙角呈45度斜角或与横梁垂直,说明该房屋存在结构性质量问题。同时,还需要用三角尺靠墙,看墙面阴阳角是否垂直。
地面用小锤轻敲检验有无空鼓
地面也是房屋中面积较大的部分,因此也需要用小锤轻敲来检验有无空鼓。如每个自然间有超过2个200mm&200mm空鼓,则需开发商维修。
门小镜子放门顶或门底查看细节
拿到钥匙后,最先应检验的就是门。先看门锁,开关是否顺畅,五金配件有无松动。关上门查看门框有无变形、损坏、划痕等情况并检验密封程度。
业主最好再用一面小镜子,放到门的顶部或底部,通过镜子照一照门的其他不容易看见的细节,比如看门的贴面情况等。
窗户若干小纸条验出窗户密封性
先检查窗户开关把手开启关闭功能是否正常灵活,再看玻璃上是否有划痕、裂纹或气泡现象等。
窗户的密封性也尤为重要,业内人士教你用一张A4纸竖向切割出若干条小纸条,关上窗户压住纸条再用力抽,如果抽不动或拉动时阻力较大,说明窗户的密封度较好。
防水最好进行24小时闭水试验
检验防水性能,需要进行24小时闭水试验。内行人士建议,在做防水测试的时候,需约齐楼上和楼下的邻居们,将厨房和卫生间蓄水,注满深度约为20厘米,待24小时后(有条件可以等待48小时),到楼下相应位置观察是否有漏水,同时也观察自己的天花板位置有无漏水。
据《成都商报》
[编辑:叶娓]
看过本文的人还看了
蓝房网编辑
11000元/㎡当前位置: &
求翻译:防水工程做完以后,需做闭水试验验收防水质量。方法是封好门口及下水口,在卫生间沉箱蓄满水,并做上记号,24―48小时之间液面若无明显下降,并且楼下住家的房顶没有发生渗漏,即为合格。而对于墙体防水施工的验收,应采取淋水试验,即使用水管在做好防水涂料的墙面上自上而下不间断喷淋3分钟,4小时以后观察墙体的另一侧是否会出现渗透现象,如果无渗透现象即可认为墙面防水施工验收合格。是什么意思?
防水工程做完以后,需做闭水试验验收防水质量。方法是封好门口及下水口,在卫生间沉箱蓄满水,并做上记号,24―48小时之间液面若无明显下降,并且楼下住家的房顶没有发生渗漏,即为合格。而对于墙体防水施工的验收,应采取淋水试验,即使用水管在做好防水涂料的墙面上自上而下不间断喷淋3分钟,4小时以后观察墙体的另一侧是否会出现渗透现象,如果无渗透现象即可认为墙面防水施工验收合格。
问题补充:
Waterproofing works done after the inspection to be done to test water quality of closed water. Method is to seal the door and drain, the water fills the caisson in the bathroom, and marking the liquid level between 24-48 hours without significant drop in home's roof and downstairs there is no leaka
Waterproofing done, needs to be done after acceptance waterproof closed water quality tests. Methods are sealed and the door in the bathroom, inlet caisson deliberately filled with water, and do mark, liquid level between 24 - 48 hours if there is no obvious decline in downstairs, and there is no ev
After the waterproof project completes, must do shuts the water test approval waterproofing quality.The method is seals the entrance and under the drainage opening, gathers the full water in the bathroom caisson, and makes the symbol, between 24-48 hour liquid level if drops not obviously, and under
After waterproof finish, waterproof quality closed water test acceptance needs to be done. Method is to seal the door and into the water, in the bathroom caisson stored-full of water, and takes on, surface between 24-48 hours if there are no noticeable decline, the roof and downstairs dwelling there
Waterproofing works done after the inspection to be done to test water quality of closed water. Method is to seal the door and drain, the water fills the caisson in the bathroom, and marking the liquid level between 24-48 hours without significant drop in home's roof and downstairs there is no leaka
我来回答:
参考资料:
* 验证码:
登录后回答可以获得积分奖励,并可以查看和管理所有的回答。 |
我要翻译和提问
请输入您需要翻译的文本!}

我要回帖

更多关于 上火脚底痒起泡咋办 的文章

更多推荐

版权声明:文章内容来源于网络,版权归原作者所有,如有侵权请点击这里与我们联系,我们将及时删除。

点击添加站长微信